IDEAL House – New Zealand

Project Goals: Certified Passive House, Positive Energy & 8/10 Homestar design. Proudly supported by IDEAL Electrical Suppliers.

Windows & Doors (Feb ’14)

Leave a comment

We are extremely pleased to finally have our triple glazed windows and doors being installed. Although we had to wait for these to arrive from Europe, the quality of them is incredible and the five point locking mechanisms pull the windows back solid into their frames. We also love how they can tilt forward, or open right up. In keeping with European norms, all the doors open out, and all the windows open in. We’ve opted for an extra foil on the outside of the uPVC which looks like brushed aluminium.

The last of the doors will be finished tomorrow, and then on Monday the large sloping windows and the large window in the master bedroom will be put in place by old-school rope and pully. We decided not to bring a crane onto site and the team at Warm Windows have been practising setting up the rigging and manoeuvring them in the factory before they try for real on site on Monday. Then they have a couple of days of fine-tuning and installing hardware on site before it’s all completed. We’ve master-keyed all the doors so a single key will work all around the house. The frosted finish in the bathrooms and entranceway is quite different to anything we’ve seen locally, and it diffuses the light amazingly well into the rooms, almost glowing.

Once we’re water-tight we can start the inside trades with earnest, and we’ll be installing significant amounts of Earthwool® glasswool insulation later next week, then the pro clima ‘intello’ wrap, and then our air pressure test (blower door) for Passive House compliance (less than 0.6 air-changes per hour at 50 pascals). Of course the team at AWS Electrical will be doing as much of the internal wiring as possible and they will also be putting the cables in for the solar panels next week. Power Technology have been on site this week installing all the brackets to hold the PV panels, which are due for installation on the 24th of February. The lighting designers from Ideal Electrical Nugent St have been finalising the lighting plan which will be featuring a wide range of Philips lights, and we’ll be getting samples to site early next week and checking them all before signing it off.

Click here or on the image below for the latest pictures.

house7

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s